KUN-QIKUN-QI SMT. CO.
CORE TECHNOLOGY 02 / STAINLESS STEEL PASSIVATION

Stainless steel passivation services

KUN-QI provides stainless steel passivation services for business customers in Taiwan and overseas. Share your component material, surface condition, quantity and technical requirements for a processing assessment. Sample and batch enquiries are welcome.

Passivation certificate issued on completion ↗

Stainless Steel Substrate · Passive FilmConceptual surface structure only. Not a test image; film thickness and geometry are not to scale.Passive FilmStainless Steel Substrate
Conceptual surface diagram, not a test image. Film thickness and dimensions are not to scale.
01 / SURFACE & PASSIVE FILM

Passivation Principles

Conceptual illustration, not a test image. Film thickness and proportions are not to scale.
SURFACE PASSIVATION
Conceptual detail, not a test image; not to scale.
Conceptual illustration, not a test image. Film thickness and proportions are not to scale.
01 / 03

Surface Condition

Stainless steel has a protective passive surface film. Iron contamination and other residues introduced during fabrication, handling or processing can affect its normal corrosion resistance.

02 / 03

Passivation Process

Chemical passivation can remove free iron and certain metallic contaminants from stainless steel surfaces, helping to support the formation and stability of the protective passive film. The treatment method is selected according to the component material, surface condition and applicable specification.

03 / 03

Surface Protection

Process selection and verification follow the material, surface condition and agreed requirements.

ASTM A967/A967M ↗
02 / THREE POINTS OF FOCUS
01

Component Requirements

Customers should complete the necessary cleaning and degreasing before delivery. KUN-QI provides stainless steel passivation services; we do not undertake heavy-soiling removal or specialist degreasing.

02

Material Assessment

Stainless steel grade, heat treatment, weld condition and service environment inform process selection; component geometry is also assessed.

03

Quality Verification

Agree the specification, revision, test method and acceptance criteria before verification.

Photographs or drawings, material, proposed quantity and inspection requirements help us assess your enquiry.

Request a Quote
03 / PROJECT WORKFLOW

Passivation Workflow & Certificate

01

Requirements Review

Material, component photographs, surface condition, quantity and intended application.

02

Technical Review

Confirm the surface condition on delivery, passivation requirements, applicable specifications and related needs.

03

Passivation

Once components meet the delivery requirements, carry out stainless steel passivation under the agreed processing conditions.

04

Passivation Certificate

On completion, we issue a passivation certificate for customer records and quality management reference.

The certificate records the passivation work carried out by KUN-QI. It is not a third-party inspection report and does not imply that every batch has undergone salt-spray or other laboratory testing.

04 / VERIFICATION

Inspection Methods

Visual inspection, contamination checks and corrosion tests answer different questions. Not every method suits every stainless steel, and a list of methods does not mean that all must be performed.

Visual inspection and cleanliness

Check visible residues, surface condition and agreed acceptance requirements.

Free-iron and contamination checks

Select methods from the applicable specification. Confirm material suitability for tests such as copper sulphate testing.

Humidity, immersion or salt-spray testing

Select the method, conditions and acceptance criteria for the specification and application, retaining the link between conditions and results.

Salt Spray Testing Standards ↗
05 / SPECIFICATION REFERENCE

Passivation standards and certificates

Passivation requirements may specify ASTM A967/A967M, MIL-STD-171E Finish No. 5.4.1 or AMS 2700. ASTM A380/A380M provides guidance on cleaning and related treatments, while ASTM B912 addresses electropolishing passivation. QQ-P-35 is a historical specification. Processing and acceptance requirements are reviewed against the applicable drawings and specifications.

Passivation certificates and treatment records ↗
ASTM A967/A967M

Chemical passivation

Chemical passivation of stainless steel parts and verification of treatment effectiveness.

↗
MIL-STD-171E Finish No. 5.4.1

Stainless Steel Passivation

This finish references the historical QQ-P-35 specification. Applicable revisions, processing conditions and acceptance requirements are reviewed against the customer’s engineering drawings.

↗
ASTM A380/A380M

Cleaning, descaling, pickling and passivation

Guidance for cleaning and treating stainless steel parts, equipment and systems.

↗
AMS 2700

Passivation of corrosion-resistant steels

Engineering requirements for removing free iron and other less noble contaminants from corrosion-resistant steel surfaces.

↗
What if a legacy drawing specifies QQ-P-35C?

QQ-P-35 is a cancelled legacy specification. When working with an older drawing, confirm the governing revision and replacement requirements with the customer rather than changing the purchase or acceptance basis unilaterally. DLA ASSIST ↗

06 / PRACTICAL QUESTIONS

Frequently Asked Questions

Can heavily oil-contaminated components be sent directly?

Please prepare components to meet our surface condition on delivery requirements before sending them.

Are passivation and electropolishing the same?

They are distinct process terms. Electropolishing can produce passivation under suitable conditions, but chemical passivation, material, surface requirements and governing specifications still need to be identified separately.

Can SMT Ra and NSS results be applied to passivation?

SMT and passivation are separate core technologies. Test data applies to its documented components and conditions; figures on the SMT page are not presented as passivation test results.

What information should accompany an enquiry?

Please provide the material specification or reference, component photographs, dimensions or drawings, surface condition, intended use, quantity and inspection requirements.

PASSIVATION / PROCESSING ENQUIRIES

Request a Passivation Quotation

Send component photographs or drawings, the material specification or reference, surface condition, proposed quantity and inspection requirements. We assess sample and batch enquiries individually; lead time and order quantity are agreed following review.

Review component requirements before delivery ↗

WhatsApp contact detailsKUN-QI WhatsApp contact QR code

Scan to add KUN-QI on WhatsApp.